Interzinc B. Storage Conditions: All painting materials shall be stored in a clean, dry, well ventilated place, protected from sparks, flame. A three component, metallic, zinc rich epoxy primer which passes Slip B coefficient. Interzinc B complies with SSPC Paint 20 and contains minimum 80%. Interzinc Call for Price. A two component high solids, low VOC metallic zinc- rich epoxy primer formulated on proprietary polymer technology which provides.

Author: Douhn Kagrel
Country: Netherlands
Language: English (Spanish)
Genre: Automotive
Published (Last): 8 February 2015
Pages: 472
PDF File Size: 15.76 Mb
ePub File Size: 19.32 Mb
ISBN: 573-1-67206-433-6
Downloads: 52248
Price: Free* [*Free Regsitration Required]
Uploader: Tygolkree

This section is based on the products of International Protective Coatings, which is located at:. International Paint has operations in 54 countries interznic and over 3, intsrzinc. International Protective Coatings is the leading supplier of high performance Protective Coatings and forms part of Akzo Nobel, a market driven, technology based company specializing in Coatings, Chemicals and Pharmaceuticals. Structural steel and framing with reference to primer receiving fire protection materials.

Severe Atmosphere Application – Industrial areas with high humidity and aggressive environments. Marine, offshore and coastal areas with high salinity.

Interior environments with permanent condensation and pollution. Moderate Atmosphere Applications – Industrial and coastal areas.

Interior chemical processing areas and swimming pools. Mild Atmosphere Applications- Urban and industrial atmospheres. Moderate sulpher diuoxide levels. Interior environment with high humidity and exposure to air pollution. Low Atmosphere or Interior Applications – Rural area, low pollution, dry environments. Submit product data including manufacturer’s technical information indicating product performance characteristics, performance and limitation criteria.

Submit manufacturer’s written installation instructions. Submit applicators current certification as a manufacturer trained and approved applicator. Submit manufacturer documentation that the fireproofing product complies with the specified contract requirements.

Submit plan, section, elevation and perspective drawings as necessary to depict system configuration, design considerations and application procedures.

lnterzinc For each finish product specified, two complete sets of color chips representing manufacturer’s full range of available materials. For each finish product specified, two samples representing actual product, color, and finish. If this location falls within a mile radius of the project site, then Interchar can contribute interzibc earning Materials and Resources Credit 5. Delete the next paragraph if not applicable. Regional Materials- 20 percent extracted, processed and manufactured regionally: High Performance coatings applied in the field with Company specializing in manufacturing products listed in this section with a minimum of ten 10 years documented experience.

The Manufacturer’s quality management system must be assessed and registered by an independent registrar as conforming to the requirements of ISO Company specializing in applying the work of this section with a minimum of three 3 years documented experience and certified by the manufacturer. All products listed in this section must be manufactured under the appropriate follow-up service with each container bearing the certified label mark. Coating will be a complete system from a iterzinc source consisting of primer and topcoat.

The following is knterzinc example of how a mock-up on a large project might be specified. When deciding on the extent of the mock-up, consider all the major different types of work on the project. Ijterzinc a mock-up for evaluation of surface preparation interzibc and application workmanship. Before proceeding with the work, the applicator will apply the primer and finish coat to a representative substrate section of square feet in size.

  BE350G LM PDF

Areas will be designated by the Architect. The application must be witnessed by the Architect’s or Owner’s representative and is subject to their approval.

Interzinc – A k i r a

Once agreed upon in writing it inherzinc as a guide jnterzinc the finished work. Do not proceed with remaining work until workmanship, color, and sheen are approved by Architect. Deliver materials in manufacturer’s original, sealed, undamaged container with identification label intact. Store materials in strict accordance with manufacturers documented instructions. All batch number, product identification and quantities shall be recorded on appropriate QC documents. A copy of inteezinc transport document and manufacturers conformance certificate shall be attached to the material delivery QC form.

Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of local authorities having jurisdiction. Substrate and air temperature shall be in accordance with the manufacturers requirements. Protect work area from windblown dust and rain.

Interzinc 315

Protect adjacent areas from over spray of coating material. Provide ventilation in areas to receive work of this section during application and minimum 24 hours after application. Temperature and Humidity Requirements: Maintain environmental conditions temperature, humidity, and ventilation within limits recommended by manufacturer for optimum results.

Do not apply coatings under environmental conditions outside manufacturer’s absolute limits. Temporary protection and heat shall be maintained at this minimum temperature for 24 hours before, during and 24 hours after material application.

Steel substrate temperature shall be a minimum of 5 deg F 3 deg C above the dew point of the surrounding air for a period of 24 hours prior and during the application of the material. If necessary for job schedule, 3155 General Contractor shall provide enclosures and heat to maintain proper temperatures and humidity levels in the application areas.

The relative humidity of the application area shall not exceed a maximum of 85 percent for 24 hours prior, during and 24 hours after the application of the material. Sequence and coordinate application of coatings with Work in other sections intdrzinc would interfere onterzinc efficient protective coating application. Do not commence adjacent or adjoining Work until the application of the coatings is complete in that area.

At project closeout, provide to Owner or Owners Representative an executed copy of the inteezinc standard limited warranty against manufacturing defect, outlining its terms, conditions, and exclusions from coverage. International Paint, LLC, which is located at: Requests for substitutions must interzin made 30 days prior to submittal and contain the full name of each product, descriptive literature, testing data collected from industry consensus standard testing, data on past performance, manufacturer’s instruction for use and interzinnc type.

Information must demonstrate equivalence of product and performance to the specified material and complete systems. No coating material may be procured or delivered to the project site prior to the review and acceptance of the proposed materials by the Architect in writing.

  BRECHT BREVIARIO DE ESTETICA TEATRAL PDF

Coordinate with Section and Contract Drawings for all Moderate Atmosphere areas of the project. Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to weather or view – corrosion-resistant finish. Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to view in all rooms and spaces except mechanical rooms, electrical rooms, and utility rooms.

Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to view in all rooms and spaces. Surfaces Not to be 31 Items specified or provided with factory finish; materials and products having factory-applied primer are not considered factory finished. Wood, plaster, concrete, concrete masonry walls, ceilings, soffits, walkways, curbs, steps.

To be interzknc by Architect from manufacturer’s full range of available colors. Retain intezinc coating systems specified and delete all others. All surfaces to receive coatings must be clean, dry and inetrzinc of oil, grease, loose mill scale, dirt, dust or other foreign substances which would impair bond of the material to the substrate.

Where necessary, cleaning or other corrections of the surfaces to receive coatings are the responsibility of the installer of the incompatible substrate. Do not commence application of coatings until the contractor, applicator and inspector have examined the surfaces to receive Work in this section, and determined that the surfaces are acceptable to receive the specified materials.

Commencement of application is acceptance of substrate. Verify that substrate and workspace temperature and humidity conditions are in accordance with requirements of this section.

Interzinc 315B

Provide masking, drop cloths or other suitable coverings to prevent overspray onto surfaces not intended to be affected by Work in this section. Clean substrate free of dust, dirt, grease or other foreign substances that would impair the bond of the coating. Grind smooth all weld spatter and inferzinc prior to commencement of coating application. Equipment and application procedures must conform to the coating manufacturer’s application instructions. Apply material at the required dry film thickness.

Apply approved primer to properly cleaned substrate in accordance with manufacturer’s application instructions. Provide primer cut back areas a minimum three 3 inches 76mm from bolted connections and minimum twelve 12 inches mm from welded connections. Primer applied off site must be in accordance with the provisions of Section Apply finish coat in accordance with the manufacturer’s interzinx instructions. Final color, gloss and finish will be determined and approved by the Architect.

Upon completion of installation, all excess material, overspray and debris must be cleared and removed from the job site.